Cargo Securing & Protection

Packing, crating and lashing solutions.

Certified industrial wooden crating, vacuum seaworthy packing, and heavy cargo lashing to international safety standards.

Operating benchmarks
ISPM 15
Certified heat-treated timber
On-site mobile
Mobile teams across UAE
IMO / ILO
Certified lashing standards
Zero moisture
Vacuum foil & desiccants
Industrial timber crates and heavy machinery lashing on flat rack container
Interport UAE Operations • Packing, crating and lashing Direct Gateway

Inadequate packing and improper lashing are the primary causes of transit damage and container rejection by shipping lines. Interport provides certified industrial packing, custom timber crating, and marine lashing services designed to withstand the physical stresses of long-distance multimodal transport.

Our certified mobile teams deploy directly to your facility, port terminal, or warehouse. Using ISPM 15 heat-treated timber, heavy-gauge steel strapping, polyester web lashing, and vacuum-sealed barrier foils with silica gel desiccants, we safeguard everything from delicate electrical switchgear to 50-tonne machinery pieces.

Operating parameters & standards

Standard equipment dimensions, terminal cut-offs, customs systems, and handling capabilities.

Operational Data Ledger
UAE Gateways & Global Standards
ParameterOperational standard & compliance
Timber standards

100% ISPM 15 compliant heat-treated wood with official phytosanitary IPPC stamp

Crating types
Fully enclosed plywood/timber boxesopen-slat skeleton cratesheavy-duty industrial wooden saddles
Protective packaging
Vapor Corrosion Inhibitor (VCI) shrink wrapmoisture-barrier vacuum foilanti-static foam cushioning
Lashing & securing
Grade 80 heavy load chainsratchetspolyester web lashingturnbuckleswelded steel stoppers
Container applications
Flat racksopen topsstandard box containersbreakbulk vessel under-deck securing
Certification issued

Lashing & Securing Certificate issued by accredited marine surveyor verifying stowage integrity

Service location

On-site at customer premises across the UAE or quayside at Jebel Ali Port and Port Rashid

01

Equipment dimensions and weight

Precise center-of-gravity and lifting lug coordinates

02

Cargo vulnerability profile

Information on sensitive dials, painted surfaces, glass, or fragile components

03

Destination country regulations

Verification of specific phytosanitary timber entry rules (e.g., Australia DAFF)

04

Storage duration expectation

For determining thickness of VCI foil and quantity of moisture-absorbing desiccant

Built around UAE trade corridors.

Custom-engineered export crates

Precision CAD-designed wooden crates built to exact equipment dimensions, ensuring optimal load distribution and container space utilization.

Seaworthy vacuum moisture preservation

Hermetically sealed aluminum foil vacuum packing with humidity indicator cards to protect unpainted metal from saltwater corrosion.

Flat rack heavy machinery lashing

Securing oversized bulldozers, turbines, and pipes to flat rack containers with certified steel chains, chocks, and D-ring tie-downs.

24/7 mobile quayside team

Equipped mobile workshops ready to carry out emergency lashing repairs or pre-loading reinforcement directly inside port gates.

Frequently asked questions

Clear answers regarding rates, transit cut-offs, customs, and documentation.

What is ISPM 15 and why is it mandatory for export crating?

ISPM 15 is an international phytosanitary standard requiring raw wood packaging materials to be heat-treated to eliminate pests before international transport. Every wooden crate we build bears the recognized IPPC heat-treatment stamp, preventing customs rejection at destination ports worldwide.

Can you pack and lash equipment at our factory or project site?

Yes. Our mobile packing and lashing teams travel across Abu Dhabi, Dubai, Sharjah, and the Northern Emirates equipped with tools, timber, and lashing gear to package cargo directly on your site.

Do you provide a Lashing Certificate for the shipping line?

Yes. For flat rack and open-top containers, shipping lines require an official Lashing & Securing Certificate prior to loading. We inspect the lashing points, verify the breaking strengths, and issue the necessary certificate.

How do you prevent rust and corrosion during ocean transit?

We wrap machinery in Vapor Corrosion Inhibitor (VCI) protective film, enclose it within heavy-gauge aluminum barrier foil, extract the air with vacuum pumps, and insert calculated desiccant packs to keep relative humidity below 30%.

Tell us what needs to move.

Send dimensions, weight, origin, and destination. Our Dubai operations desk will prepare route options and rates, usually within the same working day.